editorinchief@ijsreat.com +91 9840521421 Scholarly Open Access, Peer-reviewed, Refereed Journal e-ISSN 2583-1240 Since 2021
  1. Home
  2. Archives
  3. 2026
  4. Vol. 6 Issue 5
  5. Article
Original Article

Commercial Governance and Technical Risk Mitigation in Complex United Kingdom’s Rail Infrastructure

Open Access Peer Reviewed Crossref DOI

Authors

  • Abdul Aziz1
  • Hafiz Farahat2

1 MSc- Construction Engineering Management, Assam, India. 2 Lecturer, Department of Engineering & Construction, School of Architecture, Computing and Engineering, University of East London, United Kingdom

Article Information

Published Online
September-October 2026
Pages
150-166
Article Type
Original Article
Check for updates
check update

References

[1] B. Flyvbjerg, "Curbing Optimism Bias and Strategic Misrepresentation in Planning: Reference Class Forecasting in Practice," European Planning Studies, vol. 16, no. 1, pp. 3-21, 2008.
[2] P. Persson Schon, C. M. Eckert, A. Mallalieu and D. Bergsjo, "Project complexity and cost escalations in the early design of railway megaprojects," Proceedings of the Design Society, 2026.
[3] P. E. D. Love, D. J. Edwards and Z. Irani, "Moving Beyond Optimism Bias and Strategic Misrepresentation: An Explanation for Social Infrastructure Project Cost Overruns," IEEE Transactions on Engineering Management, vol. 59, no. 4, 2012.
[4] NEC Contracts, "NEC4: Engineering and Construction Contract Option C: target contract with activity schedule.”
[5] NEC Contracts, "NEC4: Engineering and Construction Contract."
[6] National Audit Office, The Transpennine Route Upgrade Programme, HC 572, Session 2022-23. London: NAO, 2022.
[7] Department for Transport, "£3.9 billion boost for more reliable train journeys in the North," 4 December 2023.
[8] Network Rail, "Transformational upgrades set for Huddersfield station with 30-day closure confirmed," 2025.
[9] Network Rail, SME Supplier Guide, 2025.
[10] Network Rail, "Lead Design Organisation for the Transpennine Route Upgrade Project 2bc," Find a Tender notice 2024/S 000-005849, 2024.
[11] NEC Contracts, "Network Rail lets £7 billion NEC framework contracts.”
[12] J. Eliasson, "Cost overruns of infrastructure projects - distributions, causes and remedies," Transportation Research Part A: Policy and Practice, art. 104532, 2025.
[13] T. Omotayo, B. Awuzie, V. K. Obi, S. Ajayi, L. Obi, O. Osobajo and A. Oke, "The System Dynamics Analysis of Cost Overrun Causations in UK Rail Projects in a COVID-19 Epidemic Era," SAGE Open, vol. 12, no. 2, 2022.
[14] O. Hussain, R. Moehler, S. Walsh and D. Ahiaga-Dagbui, "Minimizing Cost Overrun in Rail Projects through 5D-BIM: A Systematic Literature Review," Infrastructures, vol. 8, no. 5, art. 93, 2023.
[15] D. W. M. Chan, A. P. C. Chan, P. T. I. Lam and J. M. W. Wong, "An empirical survey of the motives and benefits of adopting guaranteed maximum price and target cost contracts in construction," International Journal of Project Management, vol. 29, no. 5, 2011.
[16] L. Chen, K. Manley, J. Lewis, F. Helfer and K. Widen, "Procurement and Governance Choices for Collaborative Infrastructure Projects," Journal of Construction Engineering and Management, vol. 144, no. 8, 2018.
[17] P. Eriksson, L. Volker, A. Kadefors, S. Lingegard, J. Larsson and L. Rosander, "Collaborative procurement strategies for infrastructure projects: a multiple-case study," Proceedings of the Institution of Civil Engineers - Management, Procurement and Law, vol. 172, no. 5, pp. 197-205, 2019.
[18] J. Song and M. Horita, "On the Effects of Pain/Gain Share in a Target Cost Contract: a Bargaining Theoretic Perspective," 2017.
[19] A. Shehadeh, O. Alshboul and O. Hamedat, "Risk Assessment Model for Optimal Gain-Pain Share Ratio in Target Cost Contract for Construction Projects," Journal of Construction Engineering and Management, vol. 148, no. 2, 2022.
[20] Y. C. Li, W. H. Luk and E. Cheng, "Hong Kong's first public sector NEC contract: lessons learnt," Proceedings of the Institution of Civil Engineers - Management, Procurement and Law, vol. 169, no. 6, pp. 231-237, 2016.
[21] S. C. L. Lui, W. C. Fung and R. Li, "Adoption of New Engineering Contract for procuring E&M works services," HKIE Transactions, vol. 20, no. 4, 2013.
[22] OECD, Procurement strategy in major infrastructure projects, OECD Public Governance Reviews. Paris: OECD Publishing, 2021.
[24] Transport for Wales, "NEC4 Engineering and Construction Contract - Option C (Build only) contract template, V2.0," 2025.
[25] HM Treasury, Spending Review 2025 (CP 1344). London: The Stationery Office, 2025.
[26] Network Rail, "TRU W2BC Tunnel Tender - ES5-8 Tender Notice," Find a Tender notice 2026/S 000-053834, 2026.
[27] BAM, "BAM appointed to deliver the next phase of the Transpennine Route Upgrade," 12 September 2024.
[28] Aziz, A. and Donyavi, S. (2026) "A PERFORMANCE-BASED ENGINEERING FRAMEWORK FOR SUSTAINABLE URBAN REGENERATION: INTEGRATING ENVIRONMENTAL COMPLIANCE, STAKEHOLDER REQUIREMENTS AND INFRASTRUCTURE RESILIENCE AT MILLENNIUM MILLS, LONDON DOCKLANDS", IJCRT - International Journal of Creative Research Thoughts (www.ijcrt.org), ISSN:2320-2882, Vol.14, Issue 10, page no.d10-d22, October-2026, Available :https://ijcrt.org/papers/IJCRT2610290.pdf
[29] VolkerRail, "Transpennine Route Upgrade - East of Leeds."
[30] SYSTRA, "Transpennine Route Upgrade (East) - Case study."
[31] Network Rail, "Transpennine Route Upgrade (TRU), European Train Control System (ETCS) GRIP 4-8 Framework Award," Find a Tender notice 2021/S 000-026469, 2021.
[32] Network Rail, "Transpennine Route Upgrade lays the foundations for a better connected North as NPR funding is confirmed," 14 January 2026.
[33] AtkinsRealis, "AtkinsRealis appointed to lead design integration for Transpennine Route Upgrade (TRU) section," 10 February 2025.
[34] Network Rail, "'Watt' a milestone - Transpennine Route Upgrade celebrates as 25% of the route is electrified," 2025.
[35] Network Rail, "First passenger train pulls into Huddersfield station following 30 days of major upgrades," 29 September 2025.
[36] Railway Supply, "Huddersfield's £70m Station Upgrade Moves to Platforms 4-6 Before 38-Day Christmas Closure," 2026.
[37] Railway News, "Alstom to Build 29 Battery-Electric Trains in Derby with £1 Billion Deal," 2026.
[38] D. Lawrance, "Transpennine Route Upgrade," Permanent Way Institution presentation, 10 April 2025.
[39] The National Archives, The Network Rail (Leeds to Micklefield Enhancements) Order 2024, SI 2024/1284, 2024.
[40] Department for Transport, "Rail boost for the North: Transpennine upgrade one step closer," 5 August 2025.
[41] RailAdvent, "York to Church Fenton stage of TRU is Complete," 5 August 2025.
[42] VolkerRail, "TRU East Alliance completes major track delivery programme on the Transpennine Route Upgrade," 2026.
[43] GOV.UK, "Northern Powerhouse Rail to drive biggest travel upgrade in the North in a generation," 14 January 2026.
APC from ₹1200 + 18% GST

Peer-reviewed open access₹1200 Indian (₹1400 with DOI)$80 USD internationalpaid after acceptance Peer-reviewed open access₹1200 Indian$80 USD international ₹1200 Indian · $80 intl

  • CrossRef DOI
  • ISSN 2583-1240
  • Open Access
  • Peer Reviewed
  • Plagiarism Checked
  • Google Scholar
Submit Paper